Construction
Bridge work begins in Woolwich March 11
Thu, 03/07/2013 - 3:00pm
Please be advised that the Route 1, Station 46 Bridge over Maine Eastern Railroad in Woolwich (bridge adjacent to the Taste of Maine) will be reduced to two 10-foot-6-inch lanes starting Monday, March 11. All wide loads will be required to seek alternate routes.
Event Date
Address
United States
Standard Post